[Dry Mist Installation Case] Midland Square
Introduction of a case where a dry mist was installed in a 30m corridor connecting the station and Midland Square.
We would like to introduce a case study on the introduction of dry mist at Midland Square. It was installed in a 30m corridor connecting the station and Midland Square. We achieved a temperature drop of about 2°C based on the average temperature difference inside and outside the mist spray area measured. 【Case Overview】 ■ Area: Approximately 150m2 ■ Total number of nozzles: 36 ■ Water usage: 1.8L/min ■ Power consumption: 0.75kW *For more details, please refer to the PDF document or feel free to contact us.
- Company:なごミスト設計
- Price:Other